Illustrative image – not actual.Power Grid Corporation of India (PGCIL) has announced the successful commissioning of its “Transmission Network Expansion in Gujarat to Increase ATC from ISTS, Part-B” project.
The project was commissioned with effect from 13 May, 2026, marking a significant step in strengthening the state’s power transmission infrastructure. The project is designed to enhance the available transfer capability (ATC) from the Inter-State Transmission System (ISTS) in Gujarat, enabling more efficient transfer of electricity across regions and improving the reliability of the transmission network. By expanding transmission capacity, the project will support growing electricity demand and facilitate the evacuation of power from generation sources to consumption centres. The commissioning aligns with PGCIL’s broader strategy of modernising and expanding India’s national transmission network to accommodate increasing power requirements and accelerate renewable energy integration.
Strengthening transmission infrastructure is critical for ensuring grid stability, improving energy accessibility, and supporting the country’s clean energy transition. The project is expected to contribute to more efficient power flow management, enhanced network resilience, and long-term energy security while supporting Gujarat’s growing industrial and economic development needs.
