Illustrative image – not actual.Punjab Energy Development Agency (PEDA) invites request for proposal (RfP) from interested developers to participate in the selection process for setting up of solar photovoltaic power projects in Punjab under Phase-III.
RfPs were invited to set up solar photovoltaic power projects in Punjab under Phase-III for sale of power to the state utility Punjab State Power Corporation (PSPCL).
The total capacity of solar photovoltaic power projects to be selected shall be 500 MWp with minimum capacity allocation of 50 MWp and maximum 150 MWp.
The last date for submission is 28 July, 2015.
More Tender info:
Setting up of Solar PV Power Projects in Punjab under Phase-III (Total Capacity 500 MW)
