PCMC proposes 7-km metro routeIllustrative image – not actual.

Pimpri-Chinchwad Municipal Corporation's (PCMC) 7-km metro route from the PCMC building in Pimpri to Dapodi on Pune-Mumbai highway is expected to cost Rs 1,188 crore. The metro route is expected to be operational in May 2014.

DMRC in its survey report has suggested that the entire metro is likely to be elevated, run on standard gauge and have six stations. The stations on this route are to be near the PCMC main office building, Sant Tukaramnagar, Nashik phata, Kasarwadi, Phugewadi and Dapodi. There will be two standard gauge tracks for the metro and each metro is likely to have four coaches and a capacity to carry 1,034 passengers.

Meanwhile, the Corporation is looking at the option of developing high-capacity mass transport route (HCMTR) or ring road from Nashik phata and back. The route passes through Pimpale Gurav, Sai Chowk, Kalewadi, Aditya Birla Memorial Hospital, Bhakti Shakti chowk, Bhosari, and Central Institute of Road Transport. The ring road is likely to links all the three BRTS routes of Pune-Mumbai highway, Aundh-ravet road and Kalewadi phata-Dehu-Alandi road.

A report on the development of the HCMTR is likely to be prepared shortly and will be tabled before the general body meeting of the Corporation in June 2010 along with the reports on metro and HCMTR.

← All latest storiesBack to top →