Illustrative image – not actual.
Patel Engineering (PEL) has been declared the lowest bidder (L1) for a Rs 240.02 crore hydropower contract in Sikkim.
Awarded by NHPC, the works involving modification of diversion tunnel into tunnel spillway arrangement, including civil and hydro mechanical works for Package VI - Teesta-V Powerstation, in a period of 18 months. The civil works of the tunnel spillway including construction adit, gate operation chamber and gate shaft, precast bridge, excess road, energy dissipation arrangement of tunnel spillway, dyke and tunnel for environment flow and its GOC.
PEL has a strong presence in irrigation, tunnels and underground works for hydroelectric and dam projects. Currently, PEL is working on NHPC-Teeat VI hydroelectric power (HEP) project (Lot-2), located near Singtam town in Sikkim, about 30 km from the proposed project site.
