Paradip Port commissions oil jetty, plans expansionIllustrative image – not actual.

Paradip Port commissioned a Rs.40 crore crude oil jetty on 20 March 2003 with a capacity to handle six to eight million tonnes of POL products per year. The jetty can also handle crude oil in tankers of up to 85,000 DWT. With this, the cargo handling capacity of the port has risen to 38 million tonnes; its capacity in 1998 was 12 million tonnes per year.

 

With a view to emerging as a leading multi-cargo port, Paradip Port has outlined some projects including deepening of the port’s channel to 17 meters to handle vessels of 1.25 lakh DWT. A clean cargo berth has also been planned to be set up on a BOT basis for which two firms have already been shortlisted. The port is also carrying out a feasibility study for the construction of a 16 meter deep harbour, on a BOT basis.

 

The Paradip Port in Orissa, featuring among the 12 major ports in India, handled an all-time record traffic of 23.8 million tonnes in 2002-03, as against 21.1 million tonnes in 2001-02.

← All latest storiesBack to top →