Panvel flyover to be ready by JuneIllustrative image – not actual.

JMC Projects is likely to open Panvel flyover for traffic in early June 2012.

The Panvel flyover is being constructed at a cost of Rs 140 crore. The project is being funded by the MMRDA and executed by the MSRDC. The 17-mtrs wide Panvel flyover will offer two lanes each for up and down traffic starts at Ashoka Lawn and ends about 300 mtrs ahead of the junction at Gandhi Hospital. The 1.5 km long main flyover also provides two arms of 437 mtrs each. These two additional 5.5-mtrs wide ramps start at New Panvel Junction and touch down at about 120 mtrs beyond Dr.Ambedkar Junction. The flyover will ease travel to Pune by the NH 4- the old Mumbai-Pune road - which passes through Panvel.

Related Links:
Project profile

← All latest storiesBack to top →