Illustrative image – not actual.Pakistan has refused to allow even a minor diversion of Neelum river by India since this could jeopardize the development of the Pak Rs.87 billion Neelum-Jhelum power project in Azad Kashmir.
India had requested Pakistan to allow it diversion of Neelum waters for power generation. It had assured that there would be no storage and the diverted water would be re-routed into the Neelum through Wullar Barrage.
WAPDA, in consultation with the Government, is arranging finances for the
project. According to Mr Riaz Ahmad Khan, chief engineering advisor and
Chairman, Federal Flood Commission, once Pakistan starts construction of the
project, India cannot divert the river waters under the Indus Water Treaty,
1960.
Diversion by India is not likely to reduce the overall water level in the Neelum on the Pakistani side of the LoC but this would affect the river flow. Decline in the river flow reduces the pressure required to generate electricity.
If Pakistan does not start construction of the Neelum-Jhelum hydel power project near Azad Kashmir's capital Muzaffarabad immediately, it is obliged under the treaty to allow India to use these waters for power generation without storage. Under the treaty, India could not change the river flow of Neelum river even for power generation that could affect any Pakistani power project. But if there is no power project in Pakistan that could be affected, India could divert the river for run-of-the-river project but without any storage.
Related news:
