Pakistan and Iran to set up joint venture refinery at a cost of Rs.6000 croreIllustrative image – not actual.

Pakistan, in a joint venture with Iran, has plans to set up a refinery near Karachi, at Hub in Balochistan, at a cost of US$ 1.23 billion (Rs.5904 crore). An agreement in this regard is expected to be signed in end December 2002.


The Balochistan government has reportedly allotted 2,000 acres of land for the refinery and its residential colony.

The refinery would process 6 million tons of Iranian heavy crude oil per year. The expected yield of basic products are - diesel 3.689 million tons, unlead gasoline 1.1 million tons, naphta 293,000 tons, sulphur 48,763 tons, coke 412,571 tons and LPG 93,000 tons.

 

The first year capacity utilization is expected to be 90 per cent and 100 per cent from remaining life of the project. The project's economic life has been taken at 25 years.

 

The annual operating cost of the project is estimated at US$ 45 million (Rs.216 crore).

← All latest storiesBack to top →