Illustrative image – not actual.Orissa Thermal Power Corporation (OPTCL), 50:50 JV between Orissa Hydro Power Corporation and Orissa Mining Corporation, has decided to scrap its proposed 1,980 MW coal based power project to be set up at Rengali in Angul district.
As per sources, difficulty in acquiring 500 acre of forest land led to OPTCL dropping the project. The company required a total of 1,300 acre for the project which was to cost Rs 8,000 crore.
Related Links:
Project profile
