Orient Abrasives to complete coal based power plant by March 2007Illustrative image – not actual.

Orient Abrasives is expected to commission its 9 MW coal based power plant by end-March 2007. Currently, machinery erection is underway.

The Rs.34 crore, which is coming up at Porbandar in Gujarat would financed through internal accruals and term loans from financial institutions & banks.

The company offers a wide range of Refractory and Monolithic products for the iron and steel industry and associated with large domestic and international clientele. It has manufacturing facilities located in Porbandar, Gujarat and Bhiwadi, Rajasthan.

Related Link:
Project profile

prjexcl
← All latest storiesBack to top →