Illustrative image – not actual.
On 09 October 2023, the Whitefield-Challaghatta Namma Metro corridor (Purple Line) commenced operations, resulting in the seamless connection of Challaghatta on the west with Whitefield (Kadugodi) on the east in Bengaluru.
The Metro commuters can now travel hassle-free from Krishnarajapura to Baiyappanahalli (distance of 2.1 km) and Kengeri to Challaghatta (distance of 2.05 km), escaping the usual traffic congestion in Bengaluru. The direct link between Challaghatta and Whitefield stretches 43.49 km with 37 stations, covering the entire distance in 76 minutes.
With the Metro now extended to Whitefield, travelling has become much more convenient. Earlier, IT professionals used to spend over 90 minutes to reach their destination by travelling to the tech parks on Outer Ring Road (ORR) from the West. However, now it will take around 60-70 minutes to reach the destination, saving from the traffic between Baiyappanahalli and KR Puram through Tin Factory.
The Bengaluru Metro Transport Corporation (BMTC) inaugurated 37 feeder buses to ORR on 10 October, 2023, which is expected to solve the last-mile connectivity challenge significantly.
The KR Pura-Baiyappahanalli stretch has been developed at a cost of Rs 363.48 crore, and the Kengeri-Challaghatta line for Rs 167.97 crore.
