ONGC has announced a Rs.4,500 crore investment plan to revive oil production from its Assam fields. Out of the total project cost, ONGC will spend Rs.2,500 crore on replacement and revamp of existing equipment, while Rs.1,584 crore would be spent on drilling.
The objective of the project, termed as the Assam Renewal Project, is to reverse declining trend in oil production from the matured fields of Assam. The company has invited an initial bid for Rs.2,500 crore to revamp installations, facilities and pipelines and hoped to attract foreign contractors for the project.
ONGC has discovered 786 million tonnes of in-place oil reserves in Assam of which 235.95 million tonnes are recoverable. Production till date has been 78.68 million tonnes, leaving a balance of 157.27 million tonnes for production.
ONGC also projected that production from its Assam wells would touch 2.66 million tonnes by 2009-10 as against the current annual average of 1.5 million tonnes. Production had peaked to 3.1 million tonnes in 1989-90.
