ONGC to adopt SPV mode for Tripura power plantIllustrative image – not actual.

Oil & Natural Gas Corporation has planned to float a special purpose vehicle for its proposed Rs.300 crore power plant in Tripura. As per latest reports, the gas-based plant with capacity 750 MW, will be constructed in partnership with IL&FS (with whom a MoU has already been signed) and Tripura Power Development Corporation.

The Tripura region has 50 wells out of which 38 are being used for gas exploration. ONGC intends to source gas by deploying the remaining 12 unused wells. The gas requirement for the 750 MW power plant is estimated at 3.75 mmscmd.

ONGC is currently carrying out a survey for moving heavy equipment required for the power plant. The SPV is also likely to formed soon.

Related News:

ONGC firms up Tripura power plant (20-Aug-04)

← All latest storiesBack to top →