Illustrative image – not actual.Oil & Natural Gas Corporation (ONGC) is reportedly considering a revamp exercise at its Bassein gas field, offshore Maharashtra.
Though production levels in the 20-year field are sagging, it still produces 28.2 mmscmd of gas. Production from Bassein dropped by 3 mmscmd during 2004-05. A revamp plan is emergent as a decline in output would adversely impact consumers in north and west India.
It is learnt that after the development plan is implemented, production from the gas field would stabilize at 25 mmscmd over the next five years.
The additional development of Bassein will include setting up new platforms and two new booster compressors. While the detailed feasibility report is under preparation, preliminary estimates suggest that the project cost will be close to Rs.2,800 crore. ONGC has already identified 97 million tonnes of oil and oil equivalent gas in east Bassein.
In another development, as part of a Rs.12,000-crore project to boost production in 15 matured fields, including Bombay High, ONGC has decided to carry out a Rs.110 crore revamp programme at Neelam oil and gas field.
Having attained a peak production of 95,400 barrels per day in November 1994, Neelam recorded a production of 21,500 bpd in November 2004. The enhancement project is expected to increase output by 15 per cent.
The bulk of ONGC's investment is directed towards Bombay High, which is currently undergoing a Rs.8,200 crore revamp plan. The field recorded a five-year production high of 2,70,000 bpd in January 2005. While the revamp project is still under way, the region is expected to produce over 3,00,000 bpd of oil during 2005-06.
