ONGC firms up Tripura power project planIllustrative image – not actual.

Oil & Natural Gas Corporation has firmed up its plans for setting up a power plant in Tripura. As per the company announcement on 19 August 2004, the gas-based plant will have capacity of 700 MW and will run on underground natural gas reserves in the state.

Fuel requirements are estimated at 2 mmscmd, a small amount considering the vast 40 billion cubic metres of gas reserves in the state. ONGC currently produces 4 mmscmd of gas in the state.

ONGC will fund the project entirely and would be executed in collaboration with Power Trading Corporation and Infrastructure Leasing & Financial Services. IL&FS would play the advisory role, while PTC will help in timely evacuation of power. The state government has offered all the necessary support to the project.

This would be ONGC's first full-fledged power plant to be operated on commercial basis. The oil major has several power  plants with an aggregate capacity of 1,000 MW, all of which are for captive power consumption.

Related News:

ONGC inks pact with IL&FS for Tripura power project (13-Jul-04)

← All latest storiesBack to top →