Illustrative image – not actual.ONGC has executed the country’s first floatover installation for offshore oil and gas field development in Mumbai offshore.
The operation for developing ONGC’s B-193 field in the Mumbai offshore involved the floatover installation of a 13,000 tonne process platform and an 8,000 tonne living quarters platform on the sea. With topside weights in exploration equipment exceeding floating crane lifting capacities, floatover installation has emerged as a reliable and cost-effective alternative.
The installation was executed on B-193 oil field with Swiber, a Singapore based engineering and logistic firm. This will provide a potential saving of between Rs 75-100 million over the conventional technology.
Related Link:
Project profile
