Illustrative image – not actual.The Odisha government has begun soil testing for the proposed 9.5-km Jayadev Vihar-Nandankanan elevated corridor.
Soil investigations are being carried out at locations including Kalinga Stadium, and Jayadev Vihar to assess ground strength and load-bearing capacity before construction begins. Land demarcation, utility shifting and other preparatory activities are also planned. The Works Department will seek NHAI permission for the section crossing the national highway overbridge near Jayadev Vihar Square in Bhubaneshwar. Approved by the Odisha Cabinet in July 2026, the corridor will widen the existing road and include flyovers, and related infrastructure.
The project aims to ease congestion and improve travel between Bhubaneswar and Cuttack, marking an initial step toward construction of the major connectivity project.
