Odisha Bridge & Construction Corpn. announces three-tier corridor project to ease road congestionIllustrative image – not actual.

Odisha Bridge & Construction Corporation (OBCC) has announced a three-tier corridor project aimed at decongesting the heavily trafficked Jaydev Vihar–Nandankanan Road.

Spanning 13.2 km, the proposed corridor will incorporate three distinct levels, ground level for public transport, a four-lane elevated corridor for mixed vehicular traffic, and a top tier dedicated to the proposed Metro system. The corridor will also include 4.626 km of slip roads and flyovers at key junctions such as XIMB Square and Kalinga Hospital Square. The infrastructure will be constructed along a 60-mtrs.-wide right of way from Pal Heights to Barang Square.

Works Minister Prithiviraj Harichandan confirmed the state government's approval: “Construction work of the elevated corridor from Jaydev Vihar to Nandankanan extending up to Barang Junction will commence soon. Technical work of the project has recently been completed and the tendering process has commenced.” This initiative aligns with Bhubaneswar’s broader Metro rail project, which proposes 20 elevated stations along the same stretch and a depot at Phulapokhari, integrating metro development with road infrastructure. OBCC has floated tenders inviting experienced firms for the execution of the project.

Designed to address longstanding issues such as congestion, lane indiscipline, and mixed traffic flow, the project also includes modern amenities like bridge lighting, road signage, and safety installations, all conforming to Indian Road Congress (IRC) guidelines.

← All latest storiesBack to top →