NTPC’s expansion of gas based power projects comes to standstillIllustrative image – not actual.

NTPC has decided to halt expansion of its gas based power projects due to non-availability of the fuel.

NTPC will be halting the expansion of its power projects at Kayamkulam (Kerala), Ramagundam (Andhra Pradesh), Kawas and Gandhar (Gujarat). The move comes in the wake of Ministry of Power advising power producers not to plan any gas based projects till 2015-16 due to gas shortage. There has been a sharp drop in output at what KG-D6 of Reliance Industries. Production at KG-D6 has dropped 40 per cent in 2011 to about 35 million standard cubic meters per day and is likely to dip further.

← All latest storiesBack to top →