Illustrative image – not actual.National Thermal Power Corporation (NTPC) has sought
the Union Ministry of Power’s intervention for the allocation of gas for its
expansion projects at Gandhar and Kawas in Gujarat. In this connection, NTPC proposes
to make a presentation before the Union Minister of Petroleum and Natural Gas,
Mr. Ram Naik, during his visit to Gandhar on 18 June 2001.
Both projects envisage a capacity expansion of 650 MW
each, at a total estimated cost of Rs.5,000 crore. The gas required for each of
these projects is three million cubic metric tonnes per day.
NTPC has decided not to go ahead with the projects until
adequate gas allocation is arranged for.
