NTPC to foray into coal miningIllustrative image – not actual.

National Thermal Power Corporation (NTPC) has planned to start producing 50 million tonnes coal annually from 2009-10. This move is aimed at reducing the coal shortage it faces. It has sought 16 mining blocks from the ministry and proposes to set up its power projects near them.

NTPC's propsed 16 mining blocks are situated in North Karanpura (10 million tonnes), Brahmani (10 million tonnes), Talcher-Ib Valley (15 million tonnes) and Chhattisgarh (10 million tonnes).

The total coal shortage, as projected by the coal ministry is 100 million tonnes. To tackle the coal shortage, NTPC has also engaged Mineral & Metals Trading Corporation for importing  2 million tonnes of coal during 2005-06.

NTPC has also drawn up a comprehensive plan to hike its presence in the hydro power sector by adding 5,000 MW in the Eleventh Plan. Of this, it is looking at 3,000 MW capacity addition in Arunachal Pradesh and 2,000 MW in Himachal Pradesh, Uttaranchal and West Bengal. Proposed projects in Arunachal Pradesh include Hutong (1,000 MW) and Kalai (1,040 MW).

NTPC has also filed expression of interest in Andhra Pradesh to set up 200 MW hydro project and 130 MW in Karnataka. The list of hydro projects include Koldam (800 MW), Tapovan Vishnugad (520 MW), Loharinag Pala (600 MW) and Lata Tapovan (108 MW). NTPC will also ink pact with the West Bengal government to set up a 90 MW hydro project on Ramam river.

← All latest storiesBack to top →