Illustrative image – not actual.
NTPC has partnered with the Delhi Jal Board to convert sludge produced in latter's sewage treatment plants into energy.
In sewage treatment plants (STPs) produce up to 800 MT of sludge per day in Delhi-NCR. Torrefied waste sludge was fired into NTPC's Unit-4 boiler at Dadri for power generation.
Firing sludge into the boiler will reduce net CO2 emission as well as water and land pollution. The company plans to have 60 GW capacity through renewable energy sources by 2032.
