Illustrative image – not actual.
NTPC has commenced power generation from its 200 MW NP Kunta ultra mega solar power project Stage-I, at Anantapuram, in Andra Pradesh.
NTPC aims to build generation capacity of 128 GW by 2032 with a lot more emphasis on renewable energy.
