Illustrative image – not actual.National Thermal Power Corporation (NTPC) has invited tenders for construction of a 33 kV substation at the Koldam Hydro Power (KHP) Project in Himachal Pradesh.
The bidder would be required to supply
and erect the equipment at the KHP project, within 10 months, at an estimated
cost of Rs.2.75 crore.
