NTPC declares commercial operation of Bongaigaon Thermal Power ProjectIllustrative image – not actual.

NTPC has declared commercial operation of its unit-3 of 250 MW of Bongaigaon Thermal Power Project (3 x 250 MW) in Assam with effect from 26 March 2019.

With this, the commercial capacity of Bongaigaon Thermal Power Project, NTPC and NTPC group will become 750 MW, 45065 MW and 52206 MW respectively.

 

← All latest storiesBack to top →