Illustrative image – not actual.The Union Minister for Power, Mr.Suresh Prabhu, has asked National
Thermal Power Corporation (NTPC) to study the feasibility of setting up a coal-based
power plant in Maharashtra.
Following the directions of the Minister, NTPC has taken up
the issue with the Government of Maharashtra.
The plant is proposed to be located at a suitable site,
which is either close to the source of coal or to the coast line with
possibility of import of coal. The issue has also been taken up with Western
Coalfields Ltd (WCL) for availability of coal in Maharashtra. WCL has said that
coal blocks to the extent of 1,000 MW capacity of power plant are available in
the Chandrapur area.
