NTPC Barh attains full load power generationIllustrative image – not actual.
The NTPC Barh has achieved full load power generation and ensured uninterrupted power generation in its plant while implementing various precautionary measures for workplace safety.

Power generation from two units of Stage-2 (1,320 MW) surpassed the memorandum of understanding (MoU) target with overall generation of around 7,804 million units in FY21.

The third unit of 660 MW (Unit-1 of Stage-1) has achieved full load in April 2021, and Bihar will receive an additional power from this 660 MW very soon.

← All latest storiesBack to top →