NTPC has targeted to have a total capacity of over 75,000 MW by 2017, the terminal year of the XII Five Year Plan period. By 2012, its capacity will have crossed 51,000 MW. NTPC currently has a capacity of 26,194 MW including 1,054 MW in joint ventures.
X Plan addition: In the X Plan period (2002-07), NTPC has added 4,500 MW of fresh capacity, the latest being 500 MW added to the Vindhyachal plant in August 2006.
Ongoing projects: NTPC is working on over 31,400 MW of fresh capacity, which is under various stages of development. Out of this, 11,050 MW (over 35 per cent) is under physical construction.
| Capacity addition in progress | ||
| Stage | MW | % share |
| Under construction | 11,050 | 35.2 |
| Under ordering | 3,120 | 9.9 |
| Under tendering | 3,980 | 12.7 |
| Waiting for gas linkages | 1,950 | 6.2 |
| Under study/approval | 11,311 | 36.0 |
| Total | 31,411 | 100.0 |
Hydropower: By 2017, NTPC has targeted to have a total hydropower capacity of 9,000 MW. This is included in the overall target of 75,000 MW. Currently, NTPC is pursuing five hydropower projects aggregating 2,211 MW.
Coal: NTPC has been alloted eight coal mine blocks, out of which two are being developed in joint venture with Coal India. NTPC has targeted to be self-reliant in coal supplies, to the extent of 20-25 per cent, through coal production from these eight blocks. By 2017, NTPC has even targeted to become the second-largest coal producer in India, next only to Coal India Ltd.