Illustrative image – not actual.Northern Coalfields (NCL) has invited bids for handling, and transportation contract for its Khadia opencast project operations.
The scope involves the mechanical loading and transport of coal directly from the surface miner face at the Khadia open-cast mines to its designated destination. Spanning an operational volume to optimise coal evacuation efficiency between key operational sites, the contract is structured for a total duration of two years for completion. Eligible bidders are required to demonstrate advanced mining logistics expertise, and strict adherence to environmental and safety guidelines throughout the contract lifecycle.
The last date for bid submission is 08 October, 2026.
