Northeast Frontier Railway invites bids for Bhojo–New Tinsukia track doubling worksIllustrative image – not actual.

Northeast Frontier Railway (NFR) has invited bids for the doubling of the railway track  covering a total length of 67.228 km in Assam.

The works will be carried out between  Bhojo (excluding 457.000 km) and New Tinsukia station (including up to 525.028 km), The stretch forms part of the Furkating–New Tinsukia doubling project and includes electrification and signalling works under a hybrid-EPC execution model., at an estimated cost of Rs 925.36 crore. The scope excludes the section of Important Bridge No. 561 along with its approaches between km 503.000 and km 503.800. The completion period for the project is set at 42 months. Once completed, the project will significantly strengthen rail connectivity in Assam, improve freight and passenger movement, and contribute to the broader expansion and modernization of the railway infrastructure network in the Northeast Frontier Railway zone.

The last date for submission of bids is 03 July, 2026.

← All latest storiesBack to top →