Illustrative image – not actual.On 29 December 2013, Oommen Chandy, Chief Minister of Kerala, inaugurated the newly built four-lane road-over-bridge (north over-bridge) at Kaloor in Kochi city, for public use.
The road-over-bridge (ROB) was built as part of the preparatory works of Kochi metro rail to ease traffic jam during construction of the metro rail.
The north road-over-bridge was constructed at a cost of Rs 50 crore and the project was undertaken by Delhi Metro Rail Corporation (DMRC), which had completed the project in 24 months.
The road-over-bridge project was undertaken in various phases. Of which, Phase-I of the ROB was completed in January 2013 and is already opened for public use. In Phase-II, the bridge has been widened to facilitate four-lane traffic.
Besides, the DMRC has decided to cancel the contract with Era-Ranken, a joint venture of Era Infra Engineering and Ranken, a Beijing-based railway construction group, to build the fourth reach of the metro rail.
DMRC did not disclose the reason for the termination of contract with Ranken, but will soon sign a contract with a new company for the metro project. Also, land for the project will be acquired soon.
Era-Ranken was expected to construct an elevated viaduct, five elevated stations (Kadavanthara, Elamkulam, Vyttila, Thaikoodam and Petta ) apart from architectural finishing works and plumbing works of stations, by September 2013.
Related Link:
Project profile
