Illustrative image – not actual.The North Central Railway has floated tender for construction of bridge in Madhya Pradesh.
The scope of work involves construction of Important Bridge No 211 spanning seven x 76.2 mtr open web girder on Kuno River between Sabalgarh-Sheopurkalan section in connection with Gwalior-Sheopurkalan (GC).
The work will be completed in 30 months at a cost of Rs 104.17 crore.
The scope of work involves construction of Important Bridge No 211 spanning seven x 76.2 mtr open web girder on Kuno River between Sabalgarh-Sheopurkalan section in connection with Gwalior-Sheopurkalan (GC).
The work will be completed in 30 months at a cost of Rs 104.17 crore.
