No coal for new UMPPsIllustrative image – not actual.

The Union Ministry of Power is likely to introduce few changes in the new ultra mega power projects (UMPP) policy. As per the proposed changes, all future projects of 4,000 MW capacity will have to rely on imported coal.

The move is aimed at protecting the limited coal resources of the country for providing fuel linkages to small and medium-sized plants.

According to policymakers, future UMPPs should be located in coastal regions to facilitate coal imports. Due to their large size they can achieve economies of scale even after importing coal.

So far the Union Government has awarded four UMPPs to private operators, two based on domestic coal and two on imported coal. Reliance Power-promoted Sasan (Madhya Pradesh) and Tilaiya (Jharkhand) projects are pit-head plants having assured coal linkages from domestic sources. Reliance Power-promoted Krishnapatnam (Andhra Pradesh) project and Tata Power's Mundra (Gujarat) UMPP are based on imported coal.

← All latest storiesBack to top →