Illustrative image – not actual.Neyveli Lignite Corporation (NLC), has received two coal blocks from the Union Ministry of Coal for its upcoming power projects at Tamil Nadu and Uttar Pradesh.
The company has recieved Jigla-Barpallii coal block at Korba and Raigarh districts of Chhattisgarh and Pachwara-South block at Rajmahal coal field in the Dumka district of Jiharkand to fuel its coal-based power projects.
NLC is planning to set up a 4,000 MW coal-based power plant near Thirumullaivasal village of Sirkali Taluk in Nagapattinam District, Tamil Nadu, in two phases. In the first stage, NLC has proposed to set up a 1,980 MW power project at an estimated cost of Rs 10,395 crore. Action has been initiated to acquire the required land through Govt of Tamil Nadu and for obtaining clearances from various statutory authorities. Neyveli Uttarpradesh Power Project (NUPPL), a JV of NLC is also planning a 1,980 MW (3 X 660 MW) coal-based thermal power project at Ghatampur in Kanpur Nagar District of Uttar Pradesh at an estimated cost of Rs 14,375.4 crore.
To arrange fuel resources for these two projects, NLC had approached the Union Coal Ministry for exclusive allocation of coal blocks. Based on the recommendation of the Inter-Ministerial Committee (IMC), the Union Ministry of Coal has allotted Jigla-Barpallii coal block at Korba and Raigarh districts of Chhattisgarh for the Sirkali project. This block has a coal reserve of 396 metric tonne spread over an area of 26 sq km.
For the Ghatampur project, the ministry has allotted Pachwara-South block at Rajmahal coal field in the Dumka District of Jiharkand. This block has a coal reserve of 279 metric tonne over an area oF 6.5 sq km.
