NLC India floats tender for grid connected solar power projectIllustrative image – not actual.
NLC India has invited bids for setting up of 300 MW grid connected solar power project at Barsingsar, in Bikaner district of Rajasthan.
 
The O&M period for the solar project is three years.
← All latest storiesBack to top →