The details of these pending power projects are as follows:

 

 

Name of project

Capacity (MW)

Estd. cost incl. IDC (Rs.cr.)

Receipt of DPR in CEA

1.Rajgarh CCPP (Madhya Pradesh)-Thermal

343.48

1128.78

10.3.97

 

                                      STATE / CENTRAL SECTOR SCHEMES:

Name of project

Capacity (MW)

Estd. cost incl. IDC (Rs.cr.)

Receipt of DPR in CEA

2. UHL HEP St.III (H.P.)-(HPSEB) Hydro

100

464.80

4.11.99

3. Koldam HEP (NTPC) (H.P) - Hydro

800

4043.08

6/01

4. Kota TPS U-6 St.IV (RRVUNL)-(Rajasthan) –Thermal

195

635.00

6/01

5. Feroz Gandhi Unchahar TPS St.III (NTPC) (U.P) - Thermal

490

2401.15

8/01

6. Valuthur (Perungulam) (T.N.E.B) - Thermal

95

343.75

5.7.2000

7. Bakreshwar TPS U-4&5 (WBPDCL)-Thermal

420

1479.00

4/01

8. Kahalgaon STPP St.II (NTPC) (Bihar)- Thermal

1320

4669.22

3/2000

9. Monarchak CCPP (NEEPCO)-(Tripura)- Thermal

500

2359.73

1849.42 (Revised)

4/2001

 