NHSRCL inks MoU for designs of high-speed rail track works with JRTCIllustrative image – not actual.
The National High Speed Rail Corporation (NHSRCL) has signed a memorandum of understanding (MoU) with the Japan Railway Track Consultant Company (JRTC) for the designs of high-speed rail (HSR) track works for T3 Package -- 116 km between Vadodara and Sabarmati Depot and Workshop in Gujarat for Mumbai-Ahmedabad High Speed Rail Corridor Project. 
 
JRTC will provide the detailed design and drawings of HSR track components like RC track bed, track slab arrangement and continuous welded rail (CWR), etc. 
 
NHSRCL had earlier signed MoU for the designs of HSR track and track works for T-2 Package -- 237 km long section between Vadodara and Vapi in Gujarat.
← All latest storiesBack to top →