Illustrative image – not actual.
The National High Speed Rail Corporation (NHSRCL) has invited bids for design and construction of about 18 km of viaduct between Anand and Sabarmati including High Speed Rail (HSR) stations at Ahmedabad and Sabarmati for Mumbai Ahmedabad High Speed Rail Corridor. The alignment also has 31 crossing bridges including six steel truss bridges.
In last few days, NHSRCL has opened three technical bids covering 64 percent (325 km out of 508 km) of the total MAHSR alignment including five HSR stations -- Vapi, Billimora, Surat, Bharuch and Anand/Nadiad out of 12 stations.
Mumbai Ahmedabad High Speed Rail will traverse through the Western Railway’s Ahmedabad Junction Railway Station and be integrated with Saraspur side of the existing Ahmedabad station. Ahmedabad HSR station will be built over the existing railway platforms no 11 and 12.
To ensure seamless integration of the HSR station with other modes of rail transport, NHSRCL has designed a user-friendly station layout for Ahmedabad. An integrated building for passenger transit is planned on east side of the existing railway station where passengers will be able to swiftly switch from one mode to another.
The building will be equipped with escalators and elevators and house many passenger convenience facilities like booking office, passenger lobby, tea/coffee kiosks and other amenities, among others.
The integrated building will provide connections to the Western Railway’s existing foot-over- bridges to facilitate passenger movement to & fro IR platforms and underground Metro station on Saraspur side.
Sabarmati being the terminal station of the Mumbai-Ahmedabad High Speed Rail Corridor, NHSRCL has planned to develop it as a multimodal transport hub. The multi-modal transit terminal has been planned on the east side of Sabarmati HSR station which will ensure smooth traffic flow in the area of HSR station.
A new road-under-bridge (RUB) has already been constructed to provide direct entry to the proposed site of Sabarmati HSR station. This will facilitate station construction without interference with the existing railway network.
