NHPC may sign pact for harnessing power from Chenab basinIllustrative image – not actual.

National Hydroelectric Power Corporation is likely to sign an agreement with Jammu & Kashmir Power Development Corporation for harnessing 2,100 MW of power from Chenab basin in the state, at an estimated cost of Rs.15,000 crore.

The draft for the MoU has been prepared and work on the projects will be started by the proposed joint venture company immediately after it has been signed by the two sides.

← All latest storiesBack to top →