NHPC lays foundation stone of head regulator works of Indo-Nepal Link CanalIllustrative image – not actual.
NHPC, a hydropower company and a PSU under the Ministry of Power, laid the foundation stone of head regulator works of Indo-Nepal Link Canal at barrage of 94.2 MW Tanakpur Power Station of NHPC located in Banbasa, Champawat district of Uttarakhand on 8 December 2020. 
 
The 1.2 km long Indo-Nepal canal is being constructed under Mahakali Treaty signed between India and Nepal.
← All latest storiesBack to top →