Illustrative image – not actual.The National Highways & Infrastructure Development Corporation (NHIDCL) has floated tender for two -lane road in Sikkim.
The scope of work envisages construction and upgradation of existing road to two-lane with paved shoulder from 37.700 km (new Rolep Bridge) to 52.000 km (Chochenpheri) of Rhenok-Menla spur (NH-717B) Package-II C in the state of Sikkim on EPC Basis under SARDP-NE Phase A.
The work will be completed in 30 months at a cost of Rs 277.79 crore.
The scope of work envisages construction and upgradation of existing road to two-lane with paved shoulder from 37.700 km (new Rolep Bridge) to 52.000 km (Chochenpheri) of Rhenok-Menla spur (NH-717B) Package-II C in the state of Sikkim on EPC Basis under SARDP-NE Phase A.
The work will be completed in 30 months at a cost of Rs 277.79 crore.
