Illustrative image – not actual.
The National Highways & Infrastructure Development Corporation (NHIDCL) has floated tender for the construction of a four-lane Panchgram bypass.
The scope of work envisages construction of four-lane Panchgram bypass from design ch 15.500 km on NH-37 (old NH-53) at Kalinagar Pt.-II village to design ch 27.400 km at crossing with NH-6 (old NH-44) near Siddeswar Pt.-I village in of Assam on EPC mode (project length - 11.9 km).
The work will be completed in a period of 30 months at a cost of Rs 394.23 crore.
