Illustrative image – not actual.National Highways Authority of India, on 19 October 2006, signed three concession agreements for four-laning a total of nearly 150 km of national highways on BOT (Build-Operate-Transfer)-Annuity basis in Uttar Pradesh and Madhya Pradesh. All the three stretches are part of NHDP-Phase II (North South Corridor) and will involve a total investment of Rs.900 crore.
As per the agreement, the concessionaires will be responsible for the design, construction, finance, operation and maintenance of the highway stretches.
The salient features of the three projects are:
|
Jhansi-Lalitpur Section (km 0.0 to km 49.70) [NH-25/26] |
|
|
Total length |
49.70 km |
|
Total Project Cost |
Rs.355.06 crore |
|
Construction period |
30 months |
|
Concessionaire |
Gayatri-Jhansi Roadways Ltd. (SPV formed by Gayatri Projects Ltd – IDFC Consortium) |
|
Bypasses |
5 |
|
Service Road |
2.65 km |
|
Bridges |
9 |
|
Vehicular Underpasses |
10 |
|
ROB (Railway Over Bridge) |
1 |
|
Bus Bays |
3 |
|
Jhansi-Lalitpur Section (km 49.700 to km 99.005) [NH-26] |
|
|
Total length |
49.305 km |
|
Total Project Cost |
Rs.276.09 crore |
|
Construction period |
30 months |
|
Concessionaire |
Gayatri-Lalitpur Roadways Ltd (SPV formed by Gayatri Projects Ltd – IDFC Consortium) |
|
Bypasses |
4 |
|
Service Road |
10.15 kms |
|
Bridges |
20 |
|
Vehicular Underpasses |
7 |
|
Bus Bays |
4 |
|
Lakhnadon (Km 547.400) to start of Seoni Bypass (Km 596.750)
[NH-7] |
|
|
Total length |
49.350 km |
|
Total Project Cost |
Rs.263.17 crore |
|
Construction period |
30 months |
|
Concessionaire |
Malaxmi Highway Pvt Ltd (SPV formed by Nava Bharat Ventures Ltd, Hyderabad) |
|
Bypasses |
2 |
|
Service Road |
675 m on both sides |
|
Bridges |
11 |
|
Vehicular Underpasses |
3 |