NHAI receives 10 bidders for Agra-Gwalior high-speed corridorIllustrative image – not actual.

The National Highways Authority of India (NHAI) has received bids from 10 infrastructure companies for the 88-km Agra-Gwalior high-speed corridor, to be built under a build-operate-transfer model at an estimated cost of Rs 4,613 crore.

Bidders include IRB Infrastructure Developers, Adani Enterprises, PNC Infratech, and Dilip Buildcon, among others. The technical bids were opened on 25 February, 2025. 

Approved in August 2024 as part of eight national high-speed corridors, the project aims to boost capacity on the Agra-Gwalior stretch of NH-44 by over two times. It will be fully access-controlled and is expected to cut the travel distance by seven percent and reduce travel time by 50 percent, lowering logistics costs. These eight projects will generate an estimated 4.42 crore man-days of direct and indirect employment.

The six-lane corridor will run from Deori in Agra to Susera in Gwalior, enhancing connectivity to key tourist sites like the Taj Mahal and Gwalior Fort. 

← All latest storiesBack to top →