Illustrative image – not actual.
National Highways Authority of India has invited RFP for four laning of Lucknow-Sultanpur section of NH-56 (New NH-731) from 11.500 km (Design Chainage 11.500) to 134.700 km (Design Chainage-138.925) (Total Length-127.425 km) in the state of Uttar Pradesh under NHDP Phase-IV on Hybrid Annuity Mode.
The estimated cost of the project is RS 1661.94 crore.
