NHAI invites bids for outer ring road construction in Andhra PradeshIllustrative image – not actual.

The National Highways Authority of India (NHAI) has invited  bids for road construction under the hybrid annuity mode (HAM) in Andhra Pradesh.

Designated as Package 1, covering a length of 27.93 km, the high-capacity infrastructure contract carries an estimated cost of 2,975.47 crore. The six-lane access-controlled Amaravati Outer Ring Road from Kanchikacherla to Nandigama is a major regional connectivity initiative aims to streamline heavy traffic movement and bypass congested urban corridors.

The bid submission deadline is 18 November, 2026.


← All latest storiesBack to top →