Illustrative image – not actual.The National Highways Authority of India (NHAI) has invited bids for construction of highways under Bharatmala Pariyojana.
The following works will be undertaken:
Construction of six-lane access controlled highway from DND Maharani Bagh to Junction with Jaitpur-Pushta Road Section of NH-148NA (design ch. 0.000 to 9.000) in the National Capital Territory of Delhi on hybrid annuity mode (HAM) at a cost of Rs 1,421.97 crore.
Construction of six-lane access-controlled highway from Junction with Jaitpur-Pushta Road to Junction with Sector-62/65 dividing road on Faridabad-Ballabhgarh Bypass Section of NH-148NA (design ch. 9.000 to 33.000), including spur from design ch. 13.200 to Junction of Faridabad-Ballabhgarh Bypass with NH-48 near Badarpur Border in the state of Haryana on HAM basis. The work will entail an investment of Rs 1,225.34 crore.
Construction of six-lane access-controlled highway from Junction with Sector-62/65 dividing road on Faridabad-Ballabhgarh Bypass to Junction near KMP Expressway with NH-148N (Delhi-Vadodara Expressway) Section of NH-148NA (Design Ch. 33.000 to 59.063) in the state of Haryana on HAM mode entailing an investment of Rs 665.91 crore.
