Illustrative image – not actual.
National Highways Authority of India has invited bids for upgradation of NH-8 in Gujarat under NHDP Phase-V.
The scope of work includes six laning of 93.210 km stretch of NH-8 from km 401.200 to km 494.410 (Package-VI) on hybrid annuity mode (HAM).
The estimated cost of the project is Rs 1076.71 crore.
