NHAI invites bids for development of greenfield highway projectIllustrative image – not actual.

The National Highways Authority of India (NHAI) has invited bids for four-laning of Abohar to Fazilka section of Abohar bypass (GT) on Hybrid Annuity Mode (HAM) in the state of Punjab.

The scope of work comprises four-laning of Abohar (design ch 75.500, existing km 49+070 of NH-07) to Fazilka (design ch 114.080, existing km 80+655 of SH-20) and construction of new four-lanes greenfield highway of Abohar bypass (from design ch 0.000, existing km 58+230 on NH-07 to design ch km 6.380, existing km 42+305, Abohar - Fazilka Road on NH-07). The development works will be carried out under Bharatmala Pariyojana.

The total length to be covered is 44.96 km.

The project is valued at Rs 971.81 crore. Last date for bid submission is 1st March, 2023.

← All latest storiesBack to top →