Illustrative image – not actual.The National Highways Authority of India (NHAI) has invited bids for the construction of a four-lane Thiruvananthapuram Outer Ring Road (ORR) in Kerala under build-operate-transfer (BOT) mode.
The proposed project covers a total design length of 62.7 km, stretching from Navaikulam (Chainage 0.000) to Vizhinjam (Chainage 62.700) along NH 866. The estimated cost is Rs 8,004.72 crore. Under the BOT model, the selected concessionaire will be responsible for construction, operation and maintenance of the corridor for a defined concession period. The ORR is expected to significantly improve regional connectivity by linking key economic, port and urban centres, particularly enhancing access to the Vizhinjam International Seaport. It will also help decongest existing road networks in and around Thiruvananthapuram by diverting heavy traffic to the bypass corridor.
The last date for submission of bids has been set as 06 August 2026.
